Avoiding building and construction disputes

Most disputes between builders and homeowners come down to the building contract: defects, incomplete work, variations, delays and payment. Getting the paperwork right at the start avoids most of them.

Construction plans, contract documents and hard hat on a desk

Builders and homeowners are both better served by resolving problems before they reach a court or tribunal. Home building in NSW is governed by the Home Building Act 1989 and its regulations, which set the licensing regime, rules of conduct for builders, statutory warranties, minimum standards, consumer protections and dispute processes. Within that framework, the contract you sign does most of the work.

Start with a clear contract

Understand the building contract before you sign it, and get advice where a term is unclear or needs to change. Three habits prevent most arguments later:

  • keep records of everything, signed by both parties where possible;
  • communicate clearly and regularly; and
  • agree the scope of works in detail at the start, and make sure it is written into the contract.

Variations

The Act's statutory warranties include that work will be done in accordance with the plans and specifications in the contract. If the work needs to change, agree the variation in writing, signed by the homeowner, before the work starts. A builder may not be able to recover the cost of a variation that was never put in writing.

A homeowner may not have to pay for a variation in limited cases, for example where the work was done without their knowledge, or was only needed because of the builder's own defective work. These cases are exceptional, and the homeowner must prove them.

Delays and extensions of time

Delay is one of the most common causes of disputes. When a builder needs more time, for example because of bad weather or a delay caused by the homeowner, they should give the homeowner a written extension of time claim that explains the reason. An unreasonable claim can expose the builder to liquidated damages under the contract. A homeowner who disagrees should respond in writing and give reasonable grounds.

Suspending work

A builder should be very careful before serving a notice suspending work, and should get legal advice first. A notice served incorrectly can lead to a damages claim by the homeowner. Suspension is usually only justified in particular circumstances, such as a homeowner failing to pay a progress payment that is properly due.

Terminating the contract

Termination is a last resort. Generally a contract can only be terminated for a substantial breach, and the contract and the law set out steps that must be followed. Get advice before taking any step to terminate: getting it wrong can leave you liable for damages.

SKM Lawyers prepared this article as general information. It is not legal advice and should not be relied on as such. Get advice about your own situation.

SKM LawyersBankstown

More from the firm

All news

Talk to us about your matter

A sentence or two is enough. Please leave out confidential details until we speak.

1300 714 749

Fax (02) 9707 2728 [email protected]

Our office is in Bankstown.

Make an enquiry

Fields marked with an asterisk are required.

Sending an enquiry does not create a lawyer and client relationship.